Car back up on axle stands, then lifted as high as possible with a trolley jack. Engine and gearbox picked up with the crane and moved into position Engine and box lowered to the rubber mat again, and walked under the mid cross member, and picked up again with the engine crane Hoisted into postion, rear and nearside gearbox mounts bolted up Trolley jack replaced the engine crane to support the Offside of the engine Engine positioned slightly high at the offside to account for rubber mount compression Some measuring up, and Ian was set to work grinding up 4mm steel angle again. Mount was tacked up on the car, then taken off for complete welding Engine now supported by the mounts. |